维普中文期刊产品整合服务
87篇 您的检索式:作者名="PEARN L"
    题名 作者 年代 出处 被引量
1Minimizing the total machine workload for the wafer probing scheduling problem显示文摘Pearn W L Chung S H Yang M H 2002IIE Transactions2002,34,2:1
2Multivariate ca- pability indices: distributional and inferential properties 显示文摘PEARN W L WANG F K YEN C H 2007Journal of Applied Statistics2007,34,8:1
3Estimating and testing process precision with presence of gauge meas- urement errors 显示文摘PEARN W L LIAO M Y YEN C H 2007Quality and Quantity2007,41,5:1
4Measuring process capability based on CPK with gauge measurement errors 显示文摘PEARN W L LIAO M Y 2005Mi- croelectronics Reliability2005,45,34:1
5Distributional and Inferential Properties of Process Capability Indices显示文摘Pearn W L Kotz S Johnson N L 1994Journal of Quality Technology1994,24,4:1
6On the generalizations of the capability index for asymmetric tolerances显示文摘Pearn W L Chen K S Lin P C 0,,01:1
7A review of first aid treatments for burn injuries 显示文摘Cuttle L Pearn J McMillan JR 2009Burns2009,35,6:1
8Approximate solutions for the capacitated arc routing problem 显示文摘Pearn W L 1989Computers and Operations Research1989,16,6:1
9Augment-insert algorithms for the capacitated are routing problem 显示文摘Pearn W L 1991Computers and Operations Research1991,18,2:1
10Algorithms for the windy postman problem 显示文摘Pearn W L Li M L 1994Computers & Operations Research1994,21,6:1
11Minimizing the totalmachine workload for the wafer probing scheduling problem显示文摘Pearn W L Chung S H Yang M H 2002IIE Transactions2002,34,:1
12New Generalization of Process Capability Index显示文摘Pearn W L Chen K S 1998Journal of Applied Statistics1998,,25:1
13A review of first aid treat- ments for burn injuries 显示文摘Cuttle L Pearn J McMillan JR 2009Burns2009,35,6:1
14Estimating process capabilityindices for non-normal Pearsonian populations显示文摘Pearn W L Chen K S 1995Qualityand Reliability Engineering International1995,11,5:1
15Algorithms for the Chinese postman problem on mixed networks 显示文摘Pearn W L Liu C M 1995Computers Operations Research1995,22,5:1
16A service level model for the control wafers safety inventory problem显示文摘Chung S H Kang H Y Pearn W L 2005International Journal of Advanced Manufacturing Technology2005,26,5:1
17Improved solutions for the Chinese postman problem on mixed networks 显示文摘Pearn W L Chou J B 1999Computers Operations Research1999,26,8:1
18A case study on the multistage IC final testing scheduling problem with reentry显示文摘Pearn W L Chung S H Chen A Y 2004International Journal of Production Economics2004,88,3:1
19Capability Measure for Processes with Multiple Characteristics 显示文摘Chen K S Pearn W L Lin P C 2003Quality and Reliability Engineering International2003,,19:1
20Scheduling integrated circuit assembly operations on die bonder 显示文摘W L Pearn S H Chung C M Lai 2007IEEE Transactions on Electronics Packaging Manufacturing2007,30,2:1
返回顶部 每页显示:
共5页 首页 上一页 第1页 下一页 末页 /5 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费