维普中文期刊产品整合服务

Recovery of Level Pillar between Open-pit and Underground Mine by Using Underhand Heading Fill Method

查看全文 作  者:Sijing Cai, Hai Zhao,Shangjun Ying 1) Civil and Environmental Engineering School, University of Science and Technology Beijing, Beijing 100083, China 2)Fujia Mine, him Nickel Corporation, Jilin 132311, China 高影响力作者 出  处:《Journal of University of Science and Technology Beijing》索引2001年第8卷第4期,共4页高影响力期刊 摘  要:The upper part of the Fujia deposit was mined out by open-pit, and the lower part is being mined underground. The level pillar between open-pit and underground mine had a thickness of 24 m, a length of 300 m and a maximum width of 35 m. As the level pillar contained about 5.2 million ton ore of high nickel grade, it was necessary to recover the level pillar. Because of special need of safety, underhand heading cut-and-fill stoping method was used. For the first two layers of heading, the cemented fill materials were a mix of water and high-aluminum-content cement with silicate gelling agent; and for other heading layers, total tailings was added into the fill mix in order to reduce the cement consumption. Finally, the level pillar was recovered successfully. 关 键 词:level pillar underhand heading method fill materials with silicate gelling agent
相关文献

参考文献(2)

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费