维普中文期刊产品整合服务

Productivity analysis of horizontal wells intercepted by multiple finite-conductivity fractures

查看全文 作  者:Wang [1]Xiaodong;Li [2]Guanghe;Wang [3]Fei 高影响力作者 机构地区:[1]School of Energy Resources, China University ofGeosciences, Beijing 100083, China;[2]China University of Petroleum, Beijing 102249, China;[3]Heriot-Watt University, Edinburgh, England高影响力机构 出  处:《Petroleum Science》索引2010年第7卷第3期,共5页高影响力期刊 摘  要:Horizontal wells in the anisotropic reservoirs can be stimulated by hydraulic fracturing in order to create multiple finite-conductivity vertical fractures. Several methods for evaluating the productivity of the horizontal wells have been presented in the literature. With such methods, however, it is still difficult to obtain an accurate result. This paper firstly presents the dimensionless conductivity theory of vertical fractures. Then models for calculating the equivalent wellbore radius and the skin factor due to flow convergence to the well bore are proposed after analyzing the steady-state flow in porous reservoirs. By applying the superposition principle to the pressure drop, a new method for evaluating the productivity of horizontal wells intercepted by multiple finite-conductivity fractures is developed. The influence of fracture conductivity and fracture half length on the horizontal well productivity is quantitatively analyzed with a synthetic case. Optimum fracture number and fracture space are further discussed in this study. The results prove that the method outlined here should be useful to design optimum fracturing of horizontal wells. 关 键 词:水平井产能 电导率 骨折 截获 生产力 各向异性油藏 垂直裂缝 水力压裂
相关文献

参考文献(14)

引证文献(8)

耦合文献(254)

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费