维普中文期刊产品整合服务

The practice of project construction and management of Three Gorges ship lock

查看全文 作  者:Fan Qixiang Yang Zongli Liu [1]Gang 高影响力作者 机构地区:[1]China Three-Gorges Corporation. Yiehang, Hubei 443002, China高影响力机构 出  处:《Engineering Sciences》索引2011年第9卷第3期,共6页高影响力期刊 摘  要:The double-line five-step ship-lock of Three Gorges Project (TGP) is an extra-large navigation structure with the maximum design total head and single-step delivery head in the world and complicated technical problems.The shiplock is a challenging and world-class project integrating the advanced techniques and equipment,the up-to-date technologies and materials,as well as the advanced project management.Through 17-year construction and 9-year operation of the ship-lock,various difficulties in design,construction,equipment manufacturing and installation as well as system debugging have been overcome effectively.The project management ideas,management system,management methods,technological innovation and team building are summarized according to the management practice of the second stage main work of Three Gorges ship-lock. 关 键 词:三峡船闸工程 项目管理 最新技术 三峡工程 设备制造 管理思想 管理制度 技术创新
相关文献

引证文献(3)

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费