维普中文期刊产品整合服务

Fuzzy linear model for production optimization of mining systems with multiple entities

查看全文 作  者:Slobodan [1]Vujic;Tomo [2]Benovic;Igor [1]Miljanovic;Marjan [3]Hudej;Aleksandar [1]Milutinovic;Petar [4]Pavlovic 高影响力作者 机构地区:[1]Faculty of Mining and Geology, Department of Applied Computing and System Engineering, University of Belgrade;[2]Mine and Thermal Power Plant Ugljevik, Ugljevik 76330, Bosnia and Herzegovina;[3]Coal Mine Velenje, Velenje 3320, Republic of Slovenia;[4]High School of Technology Professional Studies, Sabac 15000, Serbia高影响力机构 出  处:《International Journal of Minerals,Metallurgy and Materials》索引2011年第18卷第6期,共5页高影响力期刊 摘  要:Planning and production optimization within multiple mines or several work sites (entities) mining systems by using fuzzy linear programming (LP) was studied. LP is the most commonly used operations research methods in mining engineering. After the introductory review of properties and limitations of applying LP, short reviews of the general settings of deterministic and fuzzy LP models are presented. With the purpose of comparative analysis, the application of both LP models is presented using the example of the Bauxite Basin Niksic with five mines. After the assessment, LP is an efficient mathematical modeling tool in production planning and solving many other single-criteria optimization problems of mining engineering. After the comparison of advantages and deficiencies of both deterministic and fuzzy LP models, the conclusion presents benefits of the fuzzy LP model but is also stating that seeking the optimal plan of production means to accomplish the overall analysis that will encompass the LP model approaches. 关 键 词:模糊线性规划 优化生产 采矿系统 线性模型 实体 线性规划模型 LP模型 采矿工程
相关文献

参考文献(10)

引证文献(1)

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费