维普中文期刊产品整合服务

Longwall surface subsidence control by technology of isolated overburden grout injection

查看全文 作  者:Xuan [1]Dayang;Xu [1]Jialin 高影响力作者 机构地区:[1]State Key Laboratory of Coal Resources and Safe Mining,China University of Mining&Technology,Xuzhou 221116,China高影响力机构 出  处:《International Journal of Mining Science and Technology》索引2017年第27卷第5期,共6页高影响力期刊 基  金:financial support provided by the National Natural Science Foundation of China(51604258)is greatly appreciated 摘  要:Surface subsidence is a typical ground movement due to longwall mining, which causes a series of environmental problems and hazards. In China, intensive coal extractions are commonly operated under dense-populated coalfields, which exacerbates the negative subsequences resulted from surface settlement. Therefore, effective approaches to control the ground subsidence are in urgent need for the Chinese coal mining industry. This paper presents a newly developed subsidence control technology: isolated overburden grout injection, including the theory, technique and applications. Relevant procedures such as injection system design, grouting material selection, borehole layout, grout take estimation and injection process design are proposed. The applicability of this technology has been demonstrated through physical modelling, field measurements, and case studies. Since 2009, the technology has been successfully applied to 14 longwall areas in 9 Chinese coal mines. The ultimate surface subsidence factors vary from 0.10 to 0.15. This method has a great potential to be popularized and performed where longwall mining are implemented under villages and ground infrastructures. 关 键 词:LONGWALL MINING Subsidence control ISOLATED OVERBURDEN GROUT INJECTION Green MINING
相关文献

参考文献(27)

引证文献(13)

耦合文献(221)

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费