维普中文期刊产品整合服务

Deviation correction strategy for the earth pressure balance shield based on shield–soil interactions

查看全文 作  者:Liang [1,2,3]TANG;Xiangxun [1,2]KONG;Xianzhang [1,2,3]LING;Yize [4]ZHAO;Wenchong [1,2]TANG;Yifan [1,2]ZHANG 高影响力作者 机构地区:[1]School of Civil Engineering,Harbin Institute of Technology,Harbin 150090,China;[2]Heilongjiang Research Center for Rail Transit Engineering in Cold Regions,Harbin 150090,China;[3]Chongqing Research Institute,Harbin Institute of Technology,Chongqing 401135,China;[4]Department of Computer Science,University of California,Irvine,CA 92612,USA高影响力机构 出  处:《Frontiers of Mechanical Engineering》索引2022年第17卷第2期,共15页高影响力期刊 基  金:the National Key R&D Program of China(Grant No.2018YFC1505304);the National Major Scientific Instruments Development Project of China(Grant No.41627801);the State Key Program of National Natural Science Foundation of China(Grant No.41731288);the Open Research Fund Program of State Key Laboratory of Permafrost Engineering of China(Grant No.SKLFSE202015). 摘  要:The control system presently used in shield posture rectification is based on driver experience,which is marginally reliable.The study of the related theory is flawed.Therefore,a decision-making approach for the deviation correction trajectory and posture rectification load for an earth pressure balance(EPB)shield is proposed.A calculation model of posture rectification load of an EPB shield is developed by considering the interactions among the cutter head,shield shell,and ground.The additional position change during the shield attitude correction is highlighted.The posture rectification loads and shield behaviors results can be solved by the proposed method.The influences of the stratum distribution(i.e.,bedrock height in the upper-soft and lower-hard strata)on shield behaviors and posture rectification loads are analyzed.Results indicated that the increase of pitch angle in the upper-soft and lower-hard strata causes a sharp rise in vertical displacement.The bedrock height increases the magnitudes of the required posture rectification moments when hr/D>0.5.For a tunnel with hr/D≤0.5,the variation of hr/D has little effect on the posture rectification moments.Finally,the posture rectifying curves based on the theoretical model are compared with the target ones based on the double circular arc interpolation method.The required results can be obtained regardless of the soil–rock compound stratum distribution.The maximum rectification moment in the rock layer is almost 12.6 times that in the soil layer.Overall,this study provides a valuable reference for moment determination and the trajectory prediction of posture rectification in compound strata. 关 键 词:additional position change deviation correction trajectory earth pressure balance shield mechanical model posture rectification
相关文献

参考文献(46)

引证文献(4)

耦合文献(60)

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费