维普中文期刊产品整合服务
9篇 您的检索式:作者名="Bingyu Ren"
    题名 作者 年代 出处 被引量
1Research on analysis method for temperature control information of high arch dam construction显示文摘Temperature control,which is directly responsible for the project quality and progress,plays an important role in high arch dam construction.How to discover the rules from a large amount of temperature control information collected in order to guide the adjustment of temperature control measures to prevent cracks on site is the key scientific problem.In this paper,a mathematic logical model was built firstly by means of a coupling analysis of temperature control system decomposition and coordination for high arch dam.Then,an analysis method for temperature control information was presented based on data mining technology.Furthermore,the data warehouse of temperature control was designed,and the artificial neural network forecasting model for the highest temperature of concrete was also developed.Finally,these methods were applied to a practical project. The result showed that the efficiency and precision of temperature control was improved,and rationality and scientificity of management and decision-making were strengthened.All of these researches provided an advanced analysis method for temperature control in the high arch dam construction process.ZHONG DengHua,ZHAO ChenSheng & REN BingYu Department of Hydraulic and Hydroelectric Engineering,School of Civil Engineering,Tianjin University,Tianjin 300072,China 2011Science China(Technological Sciences)2011,54,S1:6
2Study on coupled 3D seepage and stress fields of the complex channel project显示文摘Seepage is a vital reason that may bring many adverse consequences such as subsidence,inclination and fracture to the channel,and is harmful to the safety and stability of the channel.Thus,a 3D visualization model is established for the engineering geological information of the research channel section by using NURBS-TIN-BRep hybrid data structure.Coupled with the VOF(volume of fluid)method,the N-S(Navier-Stokes)equations are applied to seepage simulation of the research channel section.Then the stability of the channel is studied coupled with the seepage simulation results,to comprehensively analyze the stress and displacement conditions of the channel under the impact of different factors such as seepage and underground goafs.The results of this study illustrate that the channel seepage has great influence on its stability,especially on the displacement field:it will lead to a significant sedimentation to the foundation.Therefore,during the practical construction,it is suggested that the certain part of the channel should be reinforced and effective seepage control measures should be taken.ZHONG DengHua ZHANG XiaoXin AO XueFei WANG XiaoLing TONG DaWei REN BingYu 2013Science China(Technological Sciences)2013,56,8:5
3Study on multi-scheme analysis and evaluation method for concrete sequence placement of high arch dam显示文摘A complete scheme for solving the key scientific problems of how to make concrete sequence placement scheme of high arch dam reasonable and feasible and how to meet the need of construction process was presented.First,based on a coupling analysis of concrete sequence placement system of high arch dam,a mathematical model considering complex construction constraints was established.Second,a multi-scheme computational analysis method for concrete sequence placement of high arch dam was proposed based on dynamic simulation.Third,a multi-scheme evaluation method for concrete sequence placement was put forward based on analytic hierarchy process.Fourth,feedback guidance for progress control and management in the high arch dam construction process was proposed.Finally,these methods were applied to a practical project to show that the methods can analyze and evaluate multi-scheme for concrete sequence placement of high arch dam effectively,optimize the process of dam concrete sequence placement,and recommend engineering measures.These methods provide new theoretical principles and technical measures for real-time progress control in the high arch dam construction.ZHONG GuiLiang,REN BingYu & TONG DaWei Department of Hydraulic and Hydroelectric Engineering,School of Civil Engineering,Tianjin University,Tianjin 300072,China 2011Science China(Technological Sciences)2011,54,S1:2
4Global Comprehensive Sensitivity Analysis of Arch Dam Construction Parameters Based on Orthogonal Experiment显示文摘The construction of arch dams exhibits high uncertainty. Sensitivity analysis of construction parameters is important for the design and optimization of dam construction duration. However, current research cannot fully consider the combined influences of multiple parameters on the total construction. To effectively analyze the duration of arch dam construction, this study proposes a global comprehensive sensitivity analysis method in view of the whole process of arch dam construction based on an orthogonal experiment. This method could comprehensively consider the influence of the construction parameters that may lead to the uncertainty of construction duration. In addition, this method is able to identify the key parameters that may have a significant effect on duration uncertainty and sums up the general rules of combined parameters' interaction effect, which provides a scientific basis for reasonable optimization of the duration of dam construction.Denghua Zhong Zhiqiang Chu Bingyu Ren Mengqi Zhao Tao Guan Wenshuai Song 2017Transactions of Tianjin University2017,23,5:1
5Real-timeconstruction schedule analysis of long-distance diversiontunnels based on lithological predictions using a Markovprocess显示文摘Bi Lei Ren Bingyu Zhong Denghua 2014Journal of Construction Engineering andManagement2014,4,1:1
6The method of Unity 3D based 3D dynamic interactive query of high arch dam construction information显示文摘Guan Tao Ren Bingyu Zhong Denghua 2013Applied Mechanics and Materials2013,256,1:1
7Immune‑Ageing Evaluation of Peripheral T and NK Lymphocyte Subsets in Chinese Healthy Adults显示文摘Ageing is often accompanied with a decline in immune system function,resulting in immune ageing.Numerous studies have focussed on the changes in different lymphocyte subsets in diseases and immunosenescence.The change in immune phenotype is a key indication of the diseased or healthy status.However,the changes in lymphocyte number and phenotype brought about by ageing have not been comprehensively analysed.Here,we analysed T and natural killer(NK)cell subsets,the phenotype and cell differentiation states in 43,096 healthy individuals,aged 20–88 years,without known diseases.Thirty-six immune parameters were analysed and the reference ranges of these subsets were established in different age groups divided into 5-year intervals.The data were subjected to random forest machine learning for immune-ageing modelling and confirmed using the neural network analysis.Our initial analysis and machine modelling prediction showed that na.ve T cells decreased with ageing,whereas central memory T cells(Tcm)and effector memory T cells(Tem)increased cluster of differentiation(CD)28-associated T cells.This is the largest study to investigate the correlation between age and immune cell function in a Chinese population,and provides insightful differences,suggesting that healthy adults might be considerably influenced by age and sex.The age of a person's immune system might be different from their chronological age.Our immune-ageing modelling study is one of the largest studies to provide insights into‘immune-age’rather than‘biological-age’.Through machine learning,we identified immune factors influencing the most through ageing and built a model for immune-ageing prediction.Our research not only reveals the impact of age on immune parameter differences within the Chinese population,but also provides new insights for monitoring and preventing some diseases in clinical practice.Zhenghu Jia Zhiyao Ren Dongmei Ye Jiawei Li Yan Xu Hui Liu Ziyu Meng Chengmao Yang Xiaqi Chen Xinru Mao Xueli Luo Zhe Yang Lina Ma Anyi Deng Yafang Li Bingyu Han Junping Wei Chongcheng Huang Zheng Xiang Guobing Chen Peiling Li Juan Ouyang Peisong Chen Oscar Junhong Luo Yifang Gao Zhinan Yin 2023Phenomics2023,3,4:1
8Single-cell RNA Sequencing Reveals Thoracolumbar Vertebra Heterogeneity and Rib-genesis in Pigs显示文摘Development of thoracolumbar vertebra(TLV)and rib primordium(RP)is a common evolutionary feature across vertebrates,although whole-organism analysis of the expression dynamics of TLV-and RP-related genes has been lacking.Here,we investigated the single-cell transcriptome landscape of thoracic vertebra(TV),lumbar vertebra(LV),and RP cells from a pig embryo at 27 days post-fertilization(dpf)and identified six cell types with distinct gene expression signatures.In-depth dissection of the gene expression dynamics and RNA velocity revealed a coupled process of osteogenesis and angiogenesis during TLV and RP development.Further analysis of cell type-specific and strand-specific expression uncovered the extremely high level of HOXA103′-UTR sequence specific to osteoblasts of LV cells,which may function as anti-HOXA10-antisense by counteracting the HOXA10-antisense effect to determine TLV transition.Thus,this work provides a valuable resource for understanding embryonic osteogenesis and angiogenesis underlying vertebrate TLV and RP development at the cell type-specific resolution,which serves as a comprehensive view on the transcriptional profile of animal embryo development.Jianbo Li Ligang Wang Dawei Yu Junfeng Hao Longchao Zhang Adeniyi C.Adeola Bingyu Mao Yun Gao Shifang Wu Chunling Zhu Yongqing Zhang Jilong Ren Changgai Mu David M.Irwin Lixian Wang Tang Hai Haibing Xie Yaping Zhang 2021Genomics, Proteomics & Bioinformatics2021,19,3:1
9Real-Time Update of Sequence Placement Logic for High Arch Dams Based on Evidence Weight Discount显示文摘Sequence placement logic plays a significant role in construction simulation of high arch dams and directly affects the simulation process and results.To establish a sequence logic for dam block placement,the construction scheme,real-time construction process,and random factors of the site all need to be considered in detail.There are few studies available currently that take all these factors into consideration.To address this problem,a real-time update of sequence placement logic for high arch dams based on evidence weight discount is proposed in this study.First,the subjective weight of the dam block sequence priority criteria is built using a consistent matrix method based on the construction scheme.Second,using evidence theory,dynamic objective weight of the priority criteria and basic probability assignment is built.Finally,using a weight self-adaptive adjustment method and comprehensive evidence discounting,the placing probabilities of different dam blocks are obtained.A case study indicates that this method can realize realtime update of sequence placement logic.Tao Guan Denghua Zhong Bingyu Ren 2017Transactions of Tianjin University2017,23,3:0
返回顶部 每页显示:
共1页 首页 上一页 第1页 下一页 末页 /1 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费