维普中文期刊产品整合服务
193篇 您的检索式:作者名="Drexl A"
    题名 作者 年代 出处 被引量
1Lot sizing and scheduling-survey and extensions(Invited review) 显示文摘DREXL A KIMMS A 1997European Journal of Operation Research1997,99,2:1
2Semi-active,active,and non-delay schedules for the resourceconstrained project scheduling problem显示文摘SPRECHER A KOLISCH R DREXL A 1995European Journal of Operational Research1995,80,:1
3Characterization and generation of a general class of resource-constrained project scheduling problems显示文摘KOLISH R SPRECHER A DREXL A 1995Management Science1995,41,10:1
4Adaptive search for solving hard project scheduling problems显示文摘KOLISCH R DREXL A 1996Naval Research Logistics1996,43,:1
5Resource-constrained Project Scheduling: Notation, Classification, Models, and Methods 显示文摘Brucker P Drexl A 1999European Journal of Operational Research (S0377-2217)1999,112,1:1
6Facility location model for distribution system design 显示文摘KLOSE A DREXL A 2005Eur J Operational Res2005,162,1:1
7Solving multi-mode resource-constrain- ed project scheduling by a simple, general and powerful sequencing algorithm 显示文摘SPRECHER A DREXL A 1998European Journal of Operational Research1998,107,:1
8Resource-constrained project scheduling:Notation,classification,models and methods 显示文摘BRUCKER P DREXL A MOHRING R 1999European Journal of Operational Research1999,112,1:1
9Facility location models for distribution system design显示文摘Klose A Drexl A 2005European Journal of Operational Research2005,162,1:1
10Resource- constrained project scheduling: Notation, classification, mod- els, and methods显示文摘BRUCKER P DREXL A M? HRING R 1999European Journal of Operational Re- search1999,112,1:1
11Characterization and generation of a general class of resource-constrained project scheduling problem显示文摘 Sprecher A Drexl A 1995Management Science1995,41,10:1
12Resource- constrained project scheduling: notation, ckassification, models, and methods显示文摘BRUCK P DREXL A MOHRING R NEUMANN K PESCH E 1999European Journal of Operational Research1999,112,1:1
13A simulated annealing approach to the multiconstraint zero-one knapsack problem显示文摘Drexl A 1988Computing1988,40,:1
14Adaptive search for solving hard project scheduling problem of operational research显示文摘Kolisch R Drexl A 1996Naval Research Logistics1996,43,:1
15Resource-constrained project scheduling : Notation, classification, models, and methods 显示文摘Brucker P Drexl A Mohring R 1999European Journal of Operational Research1999,112,1:1
16Network decomposition-based bench- mark result s for t he discrete time-cost tradeoff problem显示文摘Akkan C Drexl A Kimms A 2005Euro- pean Journal of Operational Research2005,165,2:1
17Facility Location Models for Distribution System Design显示文摘Klose A Drexl A 2005European Journal of Operational Research2005,162,:1
18Facility location models for distri- bution system design 显示文摘KLOSE A DREXL A 2005European Journal of Operation Research2005,162,1:1
19Facility location models for distribution system design显示文摘Klose A Drexl A 2005European Journal of Operational Research2005,162,:1
20Resource-constrainedproject scheduling: Notation, classification, models, andmethods显示文摘Brucker P Drexl A Mohring R 1999European Journal of Operational Research1999,112,1:1
返回顶部 每页显示:
共10页 首页 上一页 第1页 下一页 末页 /10 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费