维普中文期刊产品整合服务
21篇 您的检索式:作者名="KIANFAR F"
    题名 作者 年代 出处 被引量
1A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling显示文摘RANJBAR M DE REYCK B KIANFAR F 2009European Journal of Operational Research2009,193,1:1
2A muhi-objective lead time control problem in muhistage assembly systems using an interactive method显示文摘Azaron A Kianfar F 2006Applied Mathematics and Computation2006,176,2:1
3Dynamic shortest path in stochastic dynamic networks:ship routing problem显示文摘Azaron A Kianfar F 2003European Journal of Operational Research2003,144,1:1
4A GES/TS algorithm for the job shop scheduling显示文摘NASIRI M M KIANFAR F 2012Computers and Industrial Engineering2012,62,4:1
5A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty显示文摘SHADROKH S KIANFAR F 2007European Journal of Operational Research2007,181,1:1
6A multi-objective lead time control problem in multistage assembly systems using an interactive method 显示文摘Azaron A Kianfar F 2006Applied Mathematics and Computation2006,176,2:1
7A GA/TS algorithm for the stage shop scheduling problem显示文摘NASIRI M M KIANFAR F 2011Computers & Industrial Engineering2011,61,1:1
8A guided tabu search/path relinking algorithm for the job shop problem显示文摘NASIRI M M KIANFAR F 2012International Journal of Advanced Manufacturing Technology2012,58,912:1
9A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling显示文摘Ranjbar M Reyck B D Kianfar F 2009European Journal of Operational Research2009,193,1:1
10A GES/TS algorithm for the job shop scheduling 显示文摘NASIRI M M KIANFAR F 2012Computers & Industrial Engineering2012,62,4:1
11A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling 显示文摘RANJBAR M De REYCK B KIANFAR F 2009European Journal of Operational Research2009,193,1:1
12New dispatching rules to minimize rejection and tardiness costs in a dynamic flexible flow shop 显示文摘KIANFAR K GHOMI S M T F KARIMI B 2009International Journal of Advanced Manufacturing Technology2009,45,78:1
13A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling 显示文摘Ranjbar M Dereyck B Kianfar F 2009European Journal of Operational Research2009,193,1:1
14Dynamic Shortest Path in Stochastic Dynamic Networks:Ship Routing Problem显示文摘Azaron A Kianfar F 0,,01:1
15A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling显示文摘Ranjbar M Reyck B D Kianfar F 2009European Journal of Operational Research2009,193,1:1
16A guided tabu search/path relinkingalgorithm for the job shop problem 显示文摘Nasiri M M Kianfar F 2012The InternationalJournal of Advanced Manufacturing Technology2012,58,9:1
17Due Date assignment for multistage as- sembly systems 显示文摘AZARON A KIANFAR F 2009Optimization Letters2009,3,2:1
18A GES/TS algorithm for the job shop scheduling显示文摘NASIRI M M KIANFAR F 2012Computers & Industrial Engineering2012,62,4:1
19Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms显示文摘RANJBAR M R KIANFAR F 2007Applied Mathematics and Computation2007,,2:1
20A genetic algorithm for re-source investment project scheduling problem, tardinesspermitted with penalty 显示文摘SHADROKH S KIANFAR F 2007European Journal of OperationalResearch2007,181,1:1
返回顶部 每页显示:
共2页 首页 上一页 第1页 下一页 末页 /2 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费