维普中文期刊产品整合服务
7篇 您的检索式:作者名="LI Beizhi"
    题名 作者 年代 出处 被引量
1A novel speed observer based on parameter-optimized MRAS for PMSMs显示文摘Zhou Fu Yang Jianguo Li Beizhi 2008IEEE International Conference on Networking Sensing and Control ICNSC2008,2008,:1
2Steady-state Thermal Analysis and Temperature Control of High-speed Permanent Magnet Synchronous Motorized Spindle显示文摘WU Zhouping LI Beizhi YANG Jianguo 2011Applied Mechanics and Materials2011,,:1
3Event-driven dynamic and intelligent scheduling for agile manufacturing based on immune mechanism and expert system显示文摘Li Beizhi Yang Jianguo Zhou Yaqin 2003Journal of Donghua University ( English Edition)2003,20,5:1
4Interactive in- fluence of linked characteristics during machining of thin- walled parts显示文摘LI Beizhi ZUO Xiaoyan YANG Jianguo 2014International Journal of Advanced Manufac- turing Technology2014,72,9:1
5Acoustic emission method for tool condition monitoring based on wavelet analysis显示文摘Xiaozhi Chen Beizhi Li 2007The International Journal of Advanced Manufacturing Technology (-)2007,,9:1
6Design and kinetostatic analysis of a new parallel manipulator显示文摘ZHANG Dan BI Zhuming LI Beizhi 2009Robotics and Computer-Integrated Manufacturing2009,25,:1
7Generalized Reactive Manufacturing System显示文摘Generalized reactive manufacturing system named GRMS is introduced. GRMS is a human-centered system based on Multi-agent. Its management and control organization is made up of three types of agents named device agent,task agent and shop-floor agent. GRMS adopts a top down and bottom- up competition and cooperation strategy based on the dynamic sifter and funnel To constrain the behavior of agents, a reward and penaity policy is introduced into the system and the closed-loop adjustment of GRMS is realized through such policy.Agents for the same task should be cooperated with each other and agents for different tasks should compete for survival in the dynamic changing environment. A distributed-hierarchical architecture with three levels of master-slave relationships among agents are proposed.Self-propelled process planning is also discussed. In order to evaluate GRMS, a time-driven simulation system-GRMOSS is developed to check the physical consistency of GRMS.Li Beizhi(李蓓智) 2001Journal of Donghua University(English Edition)2001,18,2:0
返回顶部 每页显示:
共1页 首页 上一页 第1页 下一页 末页 /1 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费