维普中文期刊产品整合服务

Key Technical Issues of TGP Permanent Shiplock

查看全文 作  者:Fan Qixiang (China Yangtze Three Gorges Project Development Corporation, Yichang, Hubei\ 443002) 高影响力作者 出  处:《工程科学(英文版)》索引2003年第1卷第1期,共6页高影响力期刊 摘  要:To solve the high dam navigation issue of a world class project is one of the key technical issues that bring many difficulties upon the Three Gorges Project (TGP). Special requirements exist in the TGP double lane five step shiplock in terms of a general layout of navigation structures, a sedimentation hindrance to navigation, hydraulics of the water conveyance system, treatment of high and steep slopes, the manufacture and technology of both main metal structures and mechanical and electric equipment, all of which have been resolved step by step by means of scientific tests, verification and engineering practice. 关 键 词:NAVIGATION STRUCTURES WATER conveyance system HIGH and STEEP SLOPE hydraulics
相关文献

引证文献(2)

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费