维普中文期刊产品整合服务
13篇 您的检索式:作者名="Qixiang Fan"
    题名 作者 年代 出处 被引量
1A new procedure to estimate the rainfall erosivity factor based on Tropical Rainfall Measuring Mission(TRMM) data显示文摘Soil erosion by water is the most important land degradation problem worldwide.In this paper a new procedure was developed to estimate the rainfall-runoff erosivity factor(R)based on Tropical Rainfall Measuring Mission(TRMM)satellite-estimated precipitation data,which consists of 3-h rainfall intensity data.In this method,R was calculated as the product of the maximum 180-min rainfall intensity and the rainfall energy.This procedure was applied to the Daling River basin in Liaoning Province,China,R in terms of yearly,monthly and event-based rainfall in 2005 was computed separately using TRMM 3B42 data.The TRMM data showed a significant correlation with the interpolated rain-gauge data.Furthermore,because the TRMM data are based on rainfall intensity,they can represent the impact on erosion more accurately.It reflects both the spatial distribution and the intensity of rainfall.The procedure is a new approach to estimate the rainfall erosivity for soil water erosion modeling,especially in areas lacking rain-gauge stations.ZHU Qiang CHEN XiuWan FAN QiXiang JIN HePing LI JiRen 2011Science China(Technological Sciences)2011,54,9:15
2Optimization design of foundation excavation for Xiluodu super-high arch dam in China显示文摘With better understanding of the quality and physico-mechanical properties of rocks of dam foundation,and the physico-mechanical properties and structure design of arch dam in association with the foundation excavation of Xiluodu arch dam,the excavation optimization design was proposed for the foundation surface on the basis of feasibility study.Common analysis and numerical analysis results demonstrated the feasibility of using the weakly weathered rocks III1and III2as the foundation surface of super-high arch dam.In view of changes in the geological conditions at the dam foundation along the riverbed direction,the design of extending foundation surface excavation area and using consolidating grouting and optimizing structure of dam bottom was introduced,allowing for harmonization of the arch dam and foundation.Three-dimensional(3D)geomechanics model test and fi nite element analysis results indicated that the dam body and foundation have good overload stability and high bearing capacity.The monitoring data showed that the behaviors of dam and foundation correspond with the designed patterns in the construction period and the initial operation period.Qixiang Fan Shaowu Zhou Ning Yang 2015Journal of Rock Mechanics and Geotechnical Engineering2015,7,2:6
3Monitoring result analyses of high slope of five-step ship lock in the Three Gorges Project显示文摘The construction of the double-lane fi ve-step ship lock of the Three Gorges Project(TGP)was commenced in 1994,the excavation of the ship lock was completed by the end of 1999,and the ship lock was put in operation in June 2003.The side slopes of the ship lock are characterized by great height(170 m),steepness(70 m in height of upright slope),and great length(over 7000 m in total length).In association with the ship lock,the surrounding rocks in slope have a high potential to deform,with which the magnitude of deformation is restricted.Monitoring results show that the deformation of the fi ve-step ship lock high slopes of the TGP primarily occurred in excavation period,and deformation tended to be stable and convergent during operation period,suggesting the allowable ranges of deformation.At present,the slopes and lock chambers are stable,and the ship lock works well under normal operation condition,enabling the social and economic bene fi ts of the TGP.Qixiang Fan Hongbing Zhu Jun Gen 2015Journal of Rock Mechanics and Geotechnical Engineering2015,7,2:4
4Unloading performances and stabilizing practices for columnar jointed basalt:A case study of Baihetan hydropower station显示文摘The columnar jointed rock mass(CJR), composed of polygonal cross-sectional columns cut by several groups of joints in various directions, was exposed during the excavations of the Baihetan hydropower station, China. In order to investigate the unloading performances and the stability conditions during excavation of the columns, an experimental field study was performed. Firstly, on-site investigations indicated that the geotechnical problems, including rock relaxation, cracking and collapse, were the most prominent for the CJR Class I that contains intensive joint network and the smallest column sizes.Comprehensive field tests, including deformation measurement by multi-point extensometers, ultrasonic wave testing, borehole television observation and stress monitoring of rock anchors, revealed that the time-dependent relaxation of the CJRs was marked. The practical excavation experiences for the Baihetan columnar jointed rock masses, such as blasting scheme, supporting time of shotcrete and rock bolts, were presented in the excavations of the diversion tunnels. These detailed investigations and practical construction experiences can provide helpful information for similar geotechnical works in jointed rock mass.Qixiang Fan Xiating Feng Wenlin Weng Yilin Fan Quan Jiang 2017Journal of Rock Mechanics and Geotechnical Engineering2017,9,6:4
5Hot Corrosion Behavior of a Cr-Modified Aluminide Coating on a Ni-Based Superalloy显示文摘A Cr-modified aluminide coating is prepared on a Ni-based superalloy using arc ion plating and subsequent pack cementation aluminizing.Hot corrosion behavior of the Cr-modified aluminide coating exposed to molten Na2SO4/K2SO4(3:1) or Na2SO4/NaCl(3:1) salts at 900 °C in static air are evaluated as well as the aluminide coating.The results indicate that compared with the aluminide coating,the anti-corrosion properties of the Cr-modified aluminide coating in the both salts are improved,which should be attributed to the beneficial effect of the Cr in the coating.The corrosion mechanism of the Cr-modified aluminide coating,especially the role of Cr in the mixture salt corrosion,is discussed.Duoli Wu Sumeng Jiang Qixiang Fan Jun Gong Chao Sun 2014Acta Metallurgica Sinica(English Letters)2014,27,4:4
6Key technologies for the construction of the Xiluodu high arch dam on the Jinsha River in the development of hydropower in western China显示文摘Hydropower development in China is concentrated in the country's western regions.Among all the rivers in China,the lower course of the Jinsha River contains the richest hydro-energy resource,and therefore,4 mammoth hydropower plants are under construction on this particular section of the river at Wudongde,Baihetan,Xiluodu,and Xiangjiaba.The water-blocking structures of the hydropower facilities at Wudongde,Baihetan and Xiluodu are all arch dams of around 300 m high.In view of changes in the geological conditions at the foundation of the Xiluodu dam on the riverbed after excavation started,the designs of expanding foundation surface excavation and dovetailing the dam body and foundation rock on both upstream and downstream sides were introduced,allowing the arch dam and foundation to fit each other and improving the stress conditions of the dam body and foundation.By dividing the dam body into various concrete sections,the dynamic properties of concrete were adequately adjusted to the distribution of stress in the dam body.In addition,the use of the most optimal concrete material and mixture ratio allowed thermodynamics of concrete to satisfy the requirements of the strength,durability,temperature control and crack prevention of the concrete.Moreover,rigorous temperature control measures were introduced to prevent harmful cracking,thus enhancing the integrity of the arch dam.Furthermore,sophisticated construction machinery,scientific testing methods,and sound construction techniques were employed to ensure the uniformity and reliability of concrete placement.The 'Digital Dam' for the Xiluodu project,which is based on the theory of total life cycle,has supplied strong support for construction process control and decision-making.Lu Youmei Fan Qixiang Zhou Shaowu Li Bingfeng Li Wenwei 2012Engineering Sciences2012,10,2:3
7Key issues in rock mechanics of the Three Gorges Project in China显示文摘The Three Gorges Project is one of the essential key projects for flood controlling and water resources regulation in the Yangtze River.The project includes a river-crossing dam,underground powerhouses,and navigation structures.Because of the huge size and complicated construction technologies,the project faced a series of challenging engineering issues.In terms of rock mechanics,there are many key technical issues,including the sliding resistance and stability of the dam section along the foundations of powerhouses No.1-5,the slope stability of the double-line five-stage shiplock,excavation of large-scale underground powerhouses,and curtain grouting under the dam.With decades of scientific research and 16 years of practical construction experiences and reservoir operations,these key technical issues in construction of the Three Gorges Project are successfully resolved,which will attribute to the development of hydropower technology.On the basis of the monitoring data during construction and normal operation periods of the Three Gorges Project,this paper presents a systematic analysis of these key rock mechanical issues in terms of behaviors,solutions,dynamic controlling,monitoring arrangement and integrated assessment.Qixiang Fan Hongbing Zhu Xuchun Chen 2011Journal of Rock Mechanics and Geotechnical Engineering2011,3,4:2
8The practice of project construction and management of Three Gorges ship lock显示文摘The double-line five-step ship-lock of Three Gorges Project (TGP) is an extra-large navigation structure with the maximum design total head and single-step delivery head in the world and complicated technical problems.The shiplock is a challenging and world-class project integrating the advanced techniques and equipment,the up-to-date technologies and materials,as well as the advanced project management.Through 17-year construction and 9-year operation of the ship-lock,various difficulties in design,construction,equipment manufacturing and installation as well as system debugging have been overcome effectively.The project management ideas,management system,management methods,technological innovation and team building are summarized according to the management practice of the second stage main work of Three Gorges ship-lock.Fan Qixiang Yang Zongli Liu Gang 2011Engineering Sciences2011,9,3:2
9Key Technical Issues of TGP Permanent Shiplock显示文摘To solve the high dam navigation issue of a world class project is one of the key technical issues that bring many difficulties upon the Three Gorges Project (TGP). Special requirements exist in the TGP double lane five step shiplock in terms of a general layout of navigation structures, a sedimentation hindrance to navigation, hydraulics of the water conveyance system, treatment of high and steep slopes, the manufacture and technology of both main metal structures and mechanical and electric equipment, all of which have been resolved step by step by means of scientific tests, verification and engineering practice.Fan Qixiang (China Yangtze Three Gorges Project Development Corporation, Yichang, Hubei\ 443002) 2003工程科学(英文版)2003,1,1:2
10Multi-dimensional project management models for mega-construction companies and their applications显示文摘China is undertaking an increasing number of mega-infrastructure projects along with its rapid economic expansion.For participants in these projects,understand how to adapt the proper and efficient management strategies is critical.In this paper,we propose three distinct models for companies under various background and management requirements,based on sophisticated data analysis and model development.Moreover,we successfully committed these models with hydropower development projects and achieved a great progress in enhancing management efficiency.LIN ZhengHang 1,2,QIANG MaoShan 1,2,TANG WenZhe 1,2,FAN QiXiang 3 &LIU Qiang 4 1 Institute of Project Management and Construction Technology,Tsinghua University,Beijing 100084,China 2 State Key Laboratory of Hydraulic and Engineering,Tsinghua University,Beijing 100084,China 3 China Three Gorges Corporation,Yichang 443002,China 4 School of Software,Tsinghua University,Beijing 100084,China 2011Science China(Technological Sciences)2011,54,S1:1
11Existence of solutions to nonlocal functional differential integrodif-ferential equations显示文摘Dong Qixiang Fan Zhenbin Li Gang 0,,02:1
12Technology improvements and management innovations in construction of Xiluodu hydropower station on Jinsha River显示文摘Developer and owner:China Three Gorges Corporation(CTG)Engineering management:China Three Gorges Projects Development Corporation(CTGPC)Designer:Chengdu Engineering Corporation Co.,Ltd.,PowerQixiang FAN 2017Frontiers of Engineering Management2017,4,2:1
13Molecular Mechanisms of Lymphocyte-Mediated Cytotoxicity显示文摘Granule-mediated cytotoxicity is the major mechanism for lymphocytes to kill viruses, intracellular bacteria and tumors. The cytotoxic granules move to the immunological synapse by exocytosis after recognition of a killer cell.The contents of the granules are delivered into target cells with the help of perforin by endocytosis. A group of serine protease granzymes cleave their critical substrates to initiate DNA damage and cell death. The most abundant granzymes are granzyme A and B. They induce cell death through alternate and nonoverlapping pathways. The substrates and functions of the majority of the orphan granzymes have not yet been identified. It is possible that the diversity of granzymes provides fail-safe mechanisms for killing viruses and tumor cells.Zusen Fan Qixiang Zhang 2005Cellular & Molecular Immunology2005,2,4:1
返回顶部 每页显示:
共1页 首页 上一页 第1页 下一页 末页 /1 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费