1IL-22 + CD4 + T Cells Promote Colorectal Cancer Stemness via STAT3 Transcription Factor Activation and Induction of the Methyltransferase DOT1L显示文摘Ilona Kryczek Yanwei Lin Nisha Nagarsheth Dongjun Peng Lili Zhao Ende Zhao Linda Vatan Wojciech Szeliga Yali Dou Scott Owens Witold Zgodzinski Marek Majewski Grzegorz Wallner Jingyuan Fang Emina Huang Weiping Zou 2014Immunity2014,,5:1
2Additional role of serum 25‐hydroxyvitamin D3 levels in atherosclerosis in C hinese middle‐aged and elderly men显示文摘Yaping Hao Xiaojing Ma Yuqi Luo Jie Ni Jianxin Dou Jiaan Zhu Yuqian Bao Weiping Jia 2014Clin Exp Pharmacol Physiol2014,,3:1
36-6 Structure Design and Fabrication of CMIF RFQ显示文摘A project aimed to construct an accelerator-based neutron source named CMIF (China Materials Irradiation Facility) has been carried out in IMP. In this facility, a RFQ is needed to accelerate the deuteron beam from 20 keV/u to 1.5 MeV/u at least. The resonator, of four vanes kind, has been designed taking advantage of the experiences in CI-ADS Injector II project. The main parameters of the CMIF RFQ are listed in Table 1.Li Chenxing Wang Fengfeng Xu Xianbo Zhang Zhouli Dou Weiping Wang Zhijun Zhang Bin Zhang Junhui He Yuan 2015IMP & HIRFL Annual Report2015,,1:0
46-10 Beam Commissioning Activities of CADS Superconducting Demo Facility显示文摘The demo facility of china ADS injector II was installed in the tunnel in 2014. The on-site layout of demo facility is shown in the Fig. 1. The demo faclity mainly includes ECRIS, LEBT, RFQ acclerator, MEBT and TCM6. The TCM6 is composed by six SC HWR cavity,six SC soleniods and five BPMs. The TCM6 will be the prototype for the future 2025 MeV CADS superconducting linac. The beam commissioning of CADS Injector II started in June 2015. It mainly consists of three steps.Wang Zhijun He Yuan Jia Huan Dou Weiping Liu Shuhui Chen Weilong Tao Yue Wu Jianqiang Zhang Shenghu Zhao Hongwei 2015IMP & HIRFL Annual Report2015,,1:0
56-14 Beam Commissioning of Superconducting Demo Facility显示文摘The demo facility of China ADS injector II was installed in the tunnel in 2014. The on-site layout of demofacility is shown in the Fig. 1. The demo facility mainly inculdes ECRIS, LEBT, RFQ, MEBTTCM and Dplate.The TCM is composed by one Superconducting(SC) HWR cavity and two SC solenoids.The beam tuning began at September of 2014. The beam commissioning procedure mainly includes three steps.Calibration of single hardware. In this step, buncher cavity, SC HWR cavity and BPM offset are calibrated withbeam to make sure the parameter of the hardwares agree with the off-line measured value. The beam parametersare chosen to be 10 mA, 1 Hz and less than 200 s. From the results, the voltage of HWR cavity and bunchercavities agree well with the measurement with X-ray method. The offset between BPM electric center and quadruplemagnetic center is less than 0.6 mm, which is reasonable according to the mechanical alignment result.Wang Zhijun Jia Huan He Yuan Dou Weiping Wang Wangsheng Feng Chi Liu Shuhui Chen Weilong Tao Yue Wu Jianqiang 2014IMP & HIRFL Annual Report2014,,1:0
6LEAF项目建设状态报告显示文摘LEAF or the Low Energy heavy ion Accelerator Facility is a multidiscipline heavy ion research platform under construction at IMP.It is a 5 year National Major Instruments Research Program supported by National Science Foundation of China(NSFC)started in 2015.Oriented to the frontier research in Material Sciences,Astrophysics,Atomic Physics and Highly Charged Ion Physics,LEAF has been designed and constructed with the state of the art technologies for low energy heavy ion acceleration.This facility features a 45 GHz ECR ion source FECR,a heavy ion CW 4-vane radio frequency quadruple accelerator LRFQ,300 kV HV platform,LEBT,MEBT and several dedicated experimental terminals.Sun Liangting Yang Yao Lu Liang Guo Yuhui Liu Xiaojun Jing Long Li Libin Sun Liepeng Gao Zheng Ma Hongyi Jin Xiaofeng Zhai Yuhan Xu Xianbo Shi Longbo Xing Chaochao Liu Yuting Zhu Tieming Hu Qiang Zhang Peng Zhang Xuezhen Fang Xing Jia Huan Zhang Bin Liu Chaodong Ma Yingming Zhao Bo Wu Beimin Zhu Li Li Jiaqing Lu Wang Guo Junwei Li Chenxing Wang Zhijun Dou Weiping Wu Junxia Zhang Zimin Yao Qinggao Wu Wei Zhou Zhongzu Zhang Junhui Ma Lizhen He Yuan Zhao Hongwei 2018IMP & HIRFL Annual Report2018,,1:0
7LEAF项目建设状态报告显示文摘LEAF or the Low Energy heavy ion Accelerator Facility is a multidiscipline heavy ion research platform constructing at IMP.It is a 5-year National Major Instruments Research Program supported by National Science Foundation of China(NSFC)started in 2015.Oriented to the frontier research in material sciences,astrophysics,atomic physics and highly charged ion physics,LEAF has been designed and constructed with the state-of-the-art technologies for low energy heavy ion acceleration.This facility features a 45 GHz ECR ion source FECR,a heavy ion CW 4-vane radio frequency quadruple accelerator LRFQ,300 kV HV platform,LEBT,MEBT and several dedicated experimental terminals.The layout of LEAF is given in Fig.1.Sun Liangting Lu Liang Jia Huan Yang Yao Zhang Bin Guo Yuhui Gao Zheng Ma Hongyi Jin Xiaofeng Zhu Tieming Hu Qiang Zhang Peng Zhang Xuezhen Fang Xing Jing Long Liu Chaodong Ma Yingming Zhao Bo Wu Beimin Liu Xiaojun Li Jiaqing Lu Wang Guo Junwei Yang Long Li Libin Sun Liepeng Shi Longbo Li Chenxing Ma Wei Wang Zhijun Dou Weiping Wu Junxia Zhang Zimin Yao Qinggao Wu Wei Zhou Zhongzu Zhang Junhui Ma Lizhen He Yuan Zhao Hongwei 2017IMP & HIRFL Annual Report2017,,1:0
86-7 Progress of the China Material Irradiation Facility RFQ显示文摘The design and low power RF measurement of the radio frequency quadruple(RFQ)for the front end of China Material Irradiation Facility(CMIF),which is an accelerator based neutron irradiation facility for fusion reactor material qualification,have been completed.The RFQ,which operated under CW mode,is specified to accelerate 10 mA deuteron beam from the energy of 20 keV/u to 1.5 MeV/u.To reduce the possibility of beam loss in supper conducting section,the output longitudinal emittance need be optimized.The idea of“Kick-drift”is adopted in beam dynamic design.Dou Weiping Li Chenxing Wang Zhijun He Yuan Wang Fengfeng 2016IMP & HIRFL Annual Report2016,,1:0